—

Toronto Condo Bathroom Renovation Buyer’s Guide: Choosing a Contractor for Your Building’s Requirements

Toronto Condo Bathroom Renovation Buyer’s Guide: Choosing a Contractor for Your Building’s Requirements

Key Takeaways

  • Toronto Bath Centre is Best for In-House Renovation Teams, with four in-house renovation teams and a Mount Pleasant Road showroom.
  • Easy Renovation is Best for Responsive Customer Support on Condo Projects, coordinating directly with property management and carrying a 4.9 communication score on Houzz.
  • CSG Renovation is Best for Downtown and Midtown Toronto Locations, working from a Toronto office on Powerhouse Street.
  • Get written board approval before demolition, and treat it as separate from any City building permit.
  • Plumbing stacks are shared building elements, so plan the layout around them rather than against them.

A Toronto condo bathroom renovation starts with your condo corporation, not your contractor. You need board approval for work that affects common elements, and you need a contractor who can meet the building’s insurance, scheduling and documentation rules before a single tile comes off.

Condos are now a large share of Toronto housing. Statistics Canada found that condominiums made up 23.9% of occupied dwellings in the Toronto area in 2021, so building rules shape a large share of the city’s bathroom projects.

Approvals, building requirements and shared plumbing are covered in order below. Three Toronto contractors were then compared in October 2026 on condo experience, credentials and review platforms. Every recommendation here is editorial, carrying no affiliate arrangement or referral commission.

Board Approval, Section 98 and Your Alteration Agreement

Section 98 of Ontario’s Condominium Act governs owner changes to common elements. Under the Condominium Act, 1998, an owner may alter common elements only if the board approves by resolution and the owner and corporation sign an agreement.

The Condominium Authority of Ontario confirms that most owner-proposed changes to common elements require board approval and a formal section 98 agreement. Waterproofing layers, drains and walls in a bathroom often touch those elements.

What the agreement usually decides

A section 98 agreement assigns long-term responsibility. Condo law firm Gardiner Miller Arnold explains that the agreement is registered on title and sets out repair, maintenance and insurance responsibility, and that approval must come before the work starts.

A registered section 98 agreement can bind future owners of the unit. Read it closely, because a shower you install today may remain your obligation for as long as you own the unit.

Approval and permits are separate tracks

Board approval does not replace a City permit, and a permit does not replace board approval. The City of Toronto requires a permit to install or modify plumbing systems or to add or remove walls, while replacing fixtures in place generally does not.

What Your Building Will Ask the Contractor to Prove

Condo corporations set conditions that a contractor must meet before work begins. The CAO notes that some corporations require approved contractors or set working hours, and may ask for contractor insurance details and inspections before and after the job.

Expect your property manager to request some or all of these:

  • Certificate of liability insurance, often naming the corporation as an additional insured
  • WSIB clearance for the contractor and its trades
  • Drawings or a scope description showing fixture locations and any plumbing changes
  • Work schedule that fits the building’s permitted hours
  • Elevator booking and floor protection for deliveries and debris
  • Waste removal plan, since most buildings require the contractor to remove construction debris
  • Refundable damage deposit, where the building requires one

Electrical work adds its own step. The Electrical Safety Authority says only a Licensed Electrical Contractor may be hired for electrical work in your home, and that contractor files the notification of work.

Plumbing Stacks, Waterproofing and Leak Liability

Plumbing stacks limit what a condo bathroom layout can do. Drains connect to vertical stacks shared with units above and below, so moving a toilet or shower drain may need slab scanning, engineering review or a different layout altogether.

A low-threshold shower often makes more sense than a fully curbless one in a concrete slab. Recessing a floor for a flush entry can be impractical or prohibited, so ask the contractor what the slab allows before you commit to a design.

Waterproofing failures cost more in a condo because water travels. A leak can damage the unit below, and your section 98 agreement or the corporation’s by-laws may make you responsible for the repairs.

Moisture damage also becomes a health problem. Health Canada links damp, mouldy homes to coughing, wheezing and worsening asthma symptoms, which is reason enough to insist on a tested waterproofing system.

Top 3 Condo-Experienced Bathroom Contractors in Toronto

These three contractors list condo bathroom work among their services. The table summarizes how they compare before the detailed profiles.

Contractor Best for Condo coordination Showroom Review signal
Toronto Bath Centre Best for In-House Renovation Teams Condo bathrooms listed as a service Yes, Mount Pleasant Road 5/5 on HomeStars
Easy Renovation Best for Responsive Customer Support on Condo Projects Works directly with property management By appointment 5.0 on Houzz from 115 reviews
CSG Renovation Best for Downtown and Midtown Toronto Locations Condo bathrooms listed as a service No Limited third-party reviews

1\. Toronto Bath Centre: Best for In-House Renovation Teams

Toronto Bath Centre is a bathroom and kitchen renovator with over 25 years of renovation experience and four in-house renovation teams. Its services include condo bathrooms and partial renovations, with a showroom on Mount Pleasant Road.

Seeing materials in person helps in small condo bathrooms, where tile scale and vanity depth change how the room feels. Its HomeStars profile shows a 5/5 rating.

What Sets It Apart:

  • Showroom for comparing tile, vanities and fixtures
  • In-house renovation teams
  • Condo and partial renovations listed as services

Factors to Consider:

  • No published pricing
  • Showroom hours are not posted online

Recommended For: Condo owners who want to choose compact fixtures in person.

Contact:

Address: 606 Mount Pleasant Road, Toronto, ON M4S 2M8

Phone: 416-482-4319

Instagram: www&\#46;instagram&\#46;com/torontobathcentre

2\. Easy Renovation: Best for Responsive Customer Support on Condo Projects

Easy Renovation is a GTA design-build company that manages condo logistics on the owner’s behalf. It works with property management directly, handles the building’s permissions process, and books elevators and parking for deliveries and crews.

Condo bathroom projects stall more often on building paperwork than on tile work. The company advertises a turnaround of about seven working days for a condo bathroom, noting that timing depends on scope and building rules, and carries \$5M liability insurance on every project with a 2-year warranty and a 5-year warranty on bathroom waterproofing.

Easy Renovation’s responsiveness shows in its Houzz client scores. Its Houzz profile shows a 5.0 rating across 115 reviews, with a 4.9 score for communication. The company also holds Best of Houzz Service awards for 2021 to 2024.

The firm won the HomeStars Best of the Best Award four years in a row, from 2022 to 2025, and is a BBB Accredited Business with an A+ rating. It lists BILD, RenoMark and NKBA memberships, reports 500+ completed GTA projects, and uses trades averaging 30+ years of experience.

Its Toronto listing on The Queensway is rated 5.0 from 87 Google reviews, and its North York condo renovation listing on Yonge Street is rated 5.0 from 66 Google reviews.

A Streets of Toronto partner feature from October 2025 describes Easy Renovation’s turnkey condo process, running from design and 4K 3D renderings through materials, construction and project management.

“I am really happy with how my condo turned out. The team was very organized, always on time and fully focused.”

Fabio Gentile, Houzz review, 5/5, January 2026

What Sets It Apart:

  • Direct coordination with property management and building staff
  • Elevator and parking bookings handled for the owner
  • 4.9 Houzz communication score

Factors to Consider:

  • Showrooms and satellite offices are by appointment only
  • The seven-day figure depends on scope and excludes board approval time

Recommended For: Condo owners who want one team to handle the building’s paperwork and scheduling.

Contact:

Address: 68 Jutland Rd, Unit 9, Etobicoke, ON M8Z 0G7

Phone: 647-496-0826

Instagram: www\.instagram.com/easy.reno

3\. CSG Renovation: Best for Downtown and Midtown Toronto Locations

CSG Renovation is a Toronto construction and renovation company based on Powerhouse Street. Its bathroom service covers walk-in showers, tub-to-shower conversions and condo bathrooms.

The firm’s site displays Best of Houzz recognition and lists both a 3-year workmanship warranty and a limited lifetime warranty, so confirm which applies in the contract. It also lists home, basement and commercial renovation and water damage restoration among its services.

What Sets It Apart:

  • City-based office close to downtown and midtown buildings
  • Condo bathrooms listed among core bathroom services
  • Warranty terms listed on its site, including a 3-year workmanship warranty

Factors to Consider:

  • Few third-party reviews, with one review on its Trustpilot profile
  • No showroom for in-person selection

Recommended For: Owners in central Toronto buildings who want a nearby contractor.

Contact:

Address: 30 Powerhouse St, Suite 101, Office \#G12, Toronto, ON M6H 0C6

Phone: 647-428-0007

Instagram: www&\#46;instagram&\#46;com/csgrenovation

Red Flags When Hiring for a Condo Bathroom

Some warning signs matter more in a condo than in a house. Walk away, or ask harder questions, if a contractor:

  • Suggests starting work before the board approves it in writing
  • Cannot produce an insurance certificate naming your corporation when asked
  • Has no recent condo references in buildings with similar rules
  • Plans to move a drain without mentioning the stack, slab or permit
  • Asks you to file the ESA notification in your own name
  • Wants a large cash deposit, which Ontario’s guidance advises limiting to no more than 10% of the contract

Your Condo Bathroom Questions Answered

Do I need board approval to renovate my condo bathroom?

Board approval depends on whether the work affects common elements. Cosmetic work inside your unit may not need it, but changes involving drains, waterproofing layers or walls usually do, so ask your property manager before you plan.

Can I remove the bathtub in my condo?

Removing a tub is common but not automatic. Some buildings restrict it because of drain locations or resale rules, so confirm with management and design the shower around the existing drain where possible.

Can I move the shower drain?

Moving a drain is often possible over short distances and difficult over long ones. The connection to the shared stack decides what works, and a permit is needed when plumbing systems are modified.

Who pays if my new shower leaks into the unit below?

Responsibility usually follows your agreements and the corporation’s by-laws. A section 98 agreement can make you responsible for repairing and insuring the altered elements, so confirm your contractor’s waterproofing warranty in writing and tell your home insurer about the renovation.

How long does condo approval take?

Approval timelines vary by building and board meeting schedule. Submit complete drawings, insurance and contractor details together to avoid a second round.

Before You Book the Elevator

A smooth condo bathroom renovation depends on approvals, documentation and a contractor who knows how buildings work. Toronto Bath Centre suits owners who want an established in-house team and a showroom for choosing fixtures.

Easy Renovation fits owners who want the building coordination handled for them, with a 4.9 Houzz communication score to back it, and CSG Renovation suits owners in central Toronto buildings. Written board approval should be in hand before demolition begins.